- Garbage Compactor Truck
- Side Load Garbage Truck
- Roll-off Garbage Truck
- Garbage Collection Truck
- Food Waste Garbage Truck
- Skip Garbage Truck
- Ambulance
- Mobile Clinic Vehicle
- Concrete Mixer Truck
- Truck-mounted Crane
- Refrigerated Truck
- Fire Engine
- Watering Truck
- Spraying Truck
- Street Sweeper
- Vacuum Truck
- Flatbed Transport Truck
- Aerial Work Platform Truck
- Tow Truck
- Dump Truck
- LPG Truck
- LPG Storage Tank
- LPG Semi-trailer
- LPG Filling Station
Truck mounted cranes equipment
According to the development direction and needs of the market, Ni Wenjin has deployed special lightweight vehicles through research and design, new high-strength steels are used to replace traditional heavy manganese plates, which can ensure the bearing capacity and greatly reduce the weight; in addition, the side beams are used. The bending part replaces the square tube Without affecting the strength, the bending part can reduce the weight of the square tube by nearly 1/4 Lao Ni is low-key, and he is very flat on the respect of others In his words, he doesn't care what others think of him personally, only cares about the trust or distrust of his design,truck mounted cranes equipment.
CLW Group summarized the summer semi-trailer maintenance strategy for your reference:
1. Visually check the tire pressure, visually check that there is no phenomenon of air shortage or debris adhesion, and then check whether the steel rim is deformed or cracked.
2. The details of the jackhammer screw tightening should not be too troublesome. You should check whether each screw is tightened one by one.
3. For outrigger inspection, be sure to shake it up and down for a few times, and then check whether there are cracks in the weld.
4. Check the box plate, lock lever, reach out and touch the box plate hinge, box hook, plug-in pile, container lock and other small parts to see if there is any crack or fall.
5. In the cab dashboard, check whether the barometer is enough after starting the car, and then try the brakes with a foot brake.
2014: CLW Group obtained the safety production standardization certificate. Safety production standardization embodies the policy of ""safety first, prevention first, comprehensive management"" and the ""people-oriented"" scientific development concept, emphasizing the standardization, scientification, systematization and legalization of enterprise safety production work, strengthening risk management and process control, focus on performance management and continuous improvement, and comply with the basic laws of safety management. CHENGLI has always adhered to the scientific concept of safe production and will continue it.
CLW GROUP undertakes foreign aid missions from national ministries and commissions every year, using strict military quality and international standards to produce various suitable and useful special vehicles. From the United Nations to the African continent, from Southeast Asia to the Middle East, from the "Belt and Road" to Europe and North America, Chengli special vehicles have left behind a variety of foreign-aided special vehicles, allowing the world to share the reputation of Chengli manufacturing and let the world listen with strength To the sound and charm made in China.
Other emergency methods of CLW Group sewage suction trucks:
1. Oil leakage at the oil pipe joints When the sewage suction truck is in use, if there is oil leakage from the engine oil pipe joints, this situation is mostly caused by the poor sealing of the oil pipe horn and the oil pipe nut At this time, you can use cotton yarn to wrap around the lower edge of the horn, and then tighten the tubing nut and tubing joint You can also chew gum or maltose into a paste and apply it to the seat of the tubing nut When it dries, it can play a sealing role.
2. The fan belt is broken At this time, you can wrap the broken belt with iron wire, or use the start-stop method to drive the car away.
3. If the tubing is ruptured, in this case, wipe the rupture clean first, apply soap or use tape to wrap around the rupture of the tubing, tie it up with iron wire, and then apply a layer of soap,truck mounted cranes equipment.
- Chassis Brand:ISUZU
- Size:8165×2480×3500mm
- Price:Starting at$55000
- Chassis Brand:DONGFENG
- Size:8450×2500×3500mm
- Price:Starting at$70000
- Chassis Brand:DONGFENG
- Size:5990×2000×2380mm
- Price:Starting at$15000
- Chassis Brand:DONGFENG
- Size:6940×2130×2800mm
- Price:Starting at$25000